DE +49 40 411 60 68 0
UK +44 1224 459 64 0

36 Person Accomodation Module

  • Accommodation Block
  • Accomodation Block
  • Accommodation Block
  • Accommodation Block

  • Built 2012, in use from September 2012 until November 2015
  • Bureau Veritas certified
  • Electrical system 230V / 400V. 230V with Shucko sockets
  • Requirement for power plant approx. 170kW
  • Dimensions of the module L 16 m x W 18,3m x H 9,98m, 265ton
  • Footprint 16m x 5,7m + 16m x 5,65m
  • Designed ambient conditions (Air temperature +30°C to -30°C)
Real Time Web Analytics